The federal + model-code floor applies everywhere in the US. No state or locality drops below it; they only add to it. It is the uniform safety baseline every AHJ starts from — largely enabling for BESS, with worker-safety, environmental, and market rules layered on top.

Model codes and standards

How a project is permitted

Your local AHJ enforces the model codes (NFPA 855 + the adopted IFC/IRC edition). A federal nexus (federal land, funding, or permit) triggers NEPA review; EPA leads post-incident cleanup. Military installations follow their own criteria: there the Unified Facilities Criteria serve as the fire code, with unoccupied BESS structures at least 100 ft from occupied structures (UFC 3-600-01) and lithium-ion not allowed in occupied buildings (UFC 3-520-01); confirm the current UFC with the installation's fire authority (PNNL-36330 §5, Aug 2024).

Setbacks and spacing

Legislation

Places within

Sources

Check a specific system

For a proposal or a system you're evaluating, answer a few questions in BESScheck: you get the rules that apply here, a checklist of what to ask, and the sources behind each line.