Darby Township's zoning resolution (amendments effective June 11, 2026) defines "Battery Energy Storage System, Small Off-Site": "A principal use that is designed and built to connect into the distribution or transmission grid with a nameplate capacity less than 50 megawatts (MW)." The same amendments exclude it from the definition of a "Public Service Facility." The resolution does not list it as a permitted or conditional use in any zoning district, and sets no battery-specific setbacks. Ask the township zoning inspector whether battery storage is allowed anywhere in the township, and how a project of 50 MW or more would be handled.

Darby Township: small off-site battery storage defined in zoning (June 2026), not listed in any district

The township defined small off-site battery storage (under 50 MW) and excluded it from "Public Service Facility" (effective June 11, 2026); no zoning district lists it as a use. Darby Township Zoning Resolution, Art. II (amended May 11, 2026); Board of Trustees minutes, June 8, 2026

Fire and building codes in force

How a project is permitted

A battery of 50 megawatts or more: the Ohio Power Siting Board has issued certificates for stand-alone batteries under the statute that requires one for a generating plant of 50 megawatts or more (ORC 4906.01(B)(1)(a), 4906.04), and once a certificate is issued, "No public agency or political subdivision of this state may require any approval, consent, permit, certificate, or other condition for the construction or operation of a major utility facility ... authorized by a certificate"; the same section does not prevent "the application of state laws for the protection of employees engaged in the construction of such facility ... nor of municipal regulations that do not pertain to the location or design of, or pollution control and abatement standards for" it (4906.13(B)). The Board's case record (docket) holds the application, the staff report, the certificate conditions and the compliance filings; the Flint Grid docket, for example, holds a notice of compliance with its condition No. 28, "Fire Protection Plan." The county restricted-area and project-veto powers added in 2021 are written for wind and solar: "'Utility facility' means an economically significant wind farm, a large wind farm, or a large solar facility" (ORC 303.57(D)). Below 50 megawatts, ask whether the battery is part of a larger project that has a Board certificate (the Board's battery list includes solar projects with a battery component); if it isn't, the approvals are local. Ohio's township and county zoning laws, with listed exceptions, give no power over the location, construction or use of "any buildings or structures of any public utility ... or the use of land by any public utility ... for the operation of its business" (ORC 519.211(A), 303.211(A)). Ask: is the battery 50 megawatts or more, and what is the Board case number? If smaller, does your township, county or city zoning list battery storage in any district, and does it treat the owner as a public utility? Which fire code does your fire department enforce, and does it require a permit or a notice for the battery?

State permits and reporting rules that may apply